 
The proof of the quality of our products lies in examples of how our products peform on real job applications. Here are just a few of the projects that have relied on US SPEC products to get the job done. Please view the project profile document below each project for detailed information. Dick's Sporting Goods ParkCommerce City, Colorado 2007
 |  |
 | Dicks Sporting Goods Park |
PRODUCT(S) USED: Maxcure Resin Clear, GP Grout, Maxi-Bond 500 LV The contractor contacted US SPEC to solve their problem of loosening handrails during the construction of this 75 million dollar soccer complex. Boulder County Vehicle Maintenance FacilityBoulder County, Colorado Fall 2006
 |  |
 | Boulder Maintenance Facility |
PRODUCT(S) USED: Dense Top LR, Industraseal Boulder County wanted a strong, light reflective industrial floor that would resist tough abrasive forces and most vehicular fluids. City of Austin Water UtilityAustin, TX Fall 2006
 |  |
 | City of Austin Water Utility |
PRODUCT(S) USED: Thermal Grout (custom mix) Four hundred tons of grout was needed to fill the angular space between steel pipe and conduits. Strict standards were required for the grout to withstand the thermal conductivity generated. The grout also needed to be pumped over the 2000 ft. expanse. One Denver PlazaDenver, CO 2005PRODUCT(S) USED: Transpatch EXT, Acrylcoat The entry courtyard of this downtown commercial high rise was in need of resurfacing and the addition of decorative concrete elements was desired.
PETCO ParkSan Diego, CA 2004PRODUCT(S) USED: H2 Coarse, Acrylcoat The ballpark located in San Diego, CA was in need of large overlays and concrete surface repairs. The innovative design and technological features make the new park an architectural highlight of San Diego.
Spirit Lake - Mount St HelensCastle Rock, WA 2004
 |  |
 | Spirit Lake - Mount St. Helens |
PRODUCT(S) USED: MS Gunnite SF The US Army Corps of Engineers sought to prevent further erosion from happening along the cliffs surrounding the area and therefore keep debris from blocking the drainage tunnel leading away from the lake.
Galleria Corporate CenterScottsdale, AZ 2003
 |  |
 | Galleria Corporate Center |
PRODUCT(S) USED: Self Leveling Underlayment The Galleria Corporate Center in Scottsdale, AZ was in need of rehabilitation and transformation to meet the requirements of new corporate tenants. The job entailed turning a regular office into a call center for a major software company.
Gross Reservoir and DamBoulder, CO 2003PRODUCT(S) USED: NA Grout, MP Grout The project called for a new spillway as the existing spillway had reached a state that did not allow for sufficient control over water flow.
Joint Service Distribution Depot (JSDD)Tracy, CA 2003
 |  |
 | Joint Service Distribution Depot |
PRODUCT(S) USED: Radiance UV-25, SR50, Polypatch FR, EPM 3000 This project called for the rebuilding of joint systems, crack and spall repairs, grinding and sealing of concrete slabs and other miscellaneous concrete rehabilitation.
National Renewable Energies LabratoryGolden, Colorado 2009
 |  |
 | National Renewable Energies Labratory |
PRODUCT(S) USED: Ezkote Green, Maxcure Resin Clear The contracor selected US SPEC products that would help earn LEED points in several categories. Scheduled for completion in 2010, this building is expected to meet the U.S. Green Building Council's LEED Platinium rating and is designed with the intention of becoming a Zero Energy Building as defined by NREL. Cherry Creek State Park Dam Road BridgeColoradoPRODUCT(S) USED: STR Mortar, Type 3 Epoxy Binder The project called for a pumpable, slow setting, concrete repair mortar and an overlay to prevent further damage to the concrete. Marriott Ko Olina ResortOahu, HawaiiPRODUCT(S) USED: P3, Quick Set 20, V/O Patch, SLU This new construction project required several US SPEC products for repairs of vertical and horizontal surfaces and the leveling of floors. EscalaSeattle, WA 2009PRODUCT(S) USED: H2 Coarse, Floatcoat, Acrylcoat, Slickote, MP Grout, Monofilm, Maxcure Resin Clear This high profile project won several awards and used US SPEC products to aid in the completion of this building. Payson Bridge Deck ReplacementUtah DOT 2009PRODUCT(S) USED: MP Grout This DOT project implemented Utah's Accelerated Bridge Construction program which is shaping bridge construction for the future. Eisenhower TunnelColorado DOT 2008PRODUCT(S) USED: MP Grout, FS Grout The project called high performance grouts that could be placed in temperatures from freezing up to 90oF. |