These photos, taken on a cold foggy morning, are a water tank in Vancouver, WA. The contractor was making updates for safety purposes. They used US SPEC MP Grout on the base plates. Per cold weather best practices, they waited for the temperatures to rise over 40°F (4°C) before grouting.
MP Grout