The following photos are of a walkway that was topped with a coating that is deteriorating. The material is cracking and de-bonding in areas. The owner would like a new repair done. The recommendation was to remove all unsound material with mechanical abrasion after ensuring a good surface profile was achieved the area is to be saturated for 24 hours. Just prior to placing the repair material any standing water should be removed. The repair material recommended was TP Mortar. With the ability to go from feather edge to 3 inches, only one application would be needed.
TP Mortar