This photo shows a section of pipe that needed to be replaced within the concrete. The concrete was chipped out and pipe replaced. The contractor needed a product to fill back in that would match the existing concrete. US SPEC STR Mortar CI was recommended as the repair material to fill the void.

STR Mortar CI

More Voids and Defects Repairs