This photo shows a section of pipe that needed to be replaced within the concrete. The concrete was chipped out and pipe replaced. The contractor needed a product to fill back in that would match the existing concrete. US SPEC STR Mortar CI was recommended as the repair material to fill the void.
STR Mortar CI