Gerald Desmond Bridge Replacement
Long Beach, California
PRODUCT(S) USED: Ezkote Green, Slickote, RA Grout
The Gerald Desmond Bridge is a major access point to the Port of Long Beach from downtown Long Beach and surrounding communities, carrying I-710 over the Port’s Inner Harbor to Terminal Island. The replacement bridge will be a six-lane, cable-stayed design, with a 205-foot clearance to allow the newest generation of cargo ships to enter the Port.
View Project Profile
Multi-Use, Non-Petroleum, Reactive Form Release
Premium, Reactive Form Release
High Flow, Non-Aggregate, Non-Shrink Anchoring Grout