Grouting & Anchoring
Honolulu Rail Transport ProjectTraffic on Oahu is considered amount the worst in the US as most workers commute from several miles outside of Honolulu. Started in 2011, the Honolulu Rail Transport project will link key employment centers, tourist destinations, and residential communities – and offer an alternative public transportation method besides Oahu’s only option of the bus. This project utilized two US SPEC Grouts: NA-100 and MP Grout. |
US 54 Canadian River BridgeThe New Mexico Department of Transportation (NMDOT) replaced an existing steel deck truss bridge over the Canadian River south of Logan, NM. The cast-in-place segmental structure type was selected to minimize impacts to the Canadian River and wetlands. The new bridge was New Mexico’s first cast-in-place segmental bridge. |
LA Rams StadiumThis enormous project covers 298 acres and includes a 70,000 seat stadium (expandable to 100,000 seats) as well as office, retail, hotel and residential spaces. Several US SPEC products were used including NA Grout, NA-100, MP Grout, Quickset, Slickote and Ezkote Green. |
Plum Creek Water Purification PlantTo deal with the growing population of Castle Rock, Colorado, more capacity was needed for treating water. This water purification facility is designed to deliver a maximum daily production of 3-4 million gallons per day (MGD) in the short term. Production capacity will be expandable to 12 MGD. The Plum Creek facility can now purify multiple raw water sources to meet drinking water standards, including renewable indirect-reuse water and direct-reuse water. |
#4 Water Treatment Plant - MP GroutThe extensive 92 acre, $508 million project includes the water treatment plant, a water transmission main tunnelled into hard rock and 2 raw water tunnels, 9 feet and 7 feet in diameter. MP Grout was chosen to set and seal the filter channels in the media filter tanks. |
Bonneville Dam - HE GroutSeveral upgrades were needed at the dam including the replacement of the dam’s first powerhouse tailrace gantry crane rails and upgrades to the deck hatches. |
Central 70 ExpansionThis project, more than 14 years in the making, will be Colorado's largest ever transportation project. NA-100 was used on the construction of several new bridges. |
Eisenhower Tunnel - MP Grout, FS GroutEisenhower Tunnel is the highest vehicular tunnel in the world, traversing through the Continental Divide at an average elevation of 11,112 feet. Approximately, 2,191 of ceramic tile faced concrete panels, lining 1.7 miles of the tunnel walls, were to be replaced. |
Gerrald Desmond Bridge Replacement - RA GroutThe Gerald Desmond Bridge is a major access point to the Port of Long Beach from downtown Long Beach and surrounding communities, carrying I-710 over the Port’s Inner Harbor to Terminal Island.... |
Howard Gap Road - RA GroutBetween 2006 and 2014, the road recorded the second highest number of accidents among rural roads in the county. To bring relief, the state approved Howard Gap Road to be widened and realigned.
|
Hutchinson Channel - GP GroutThe Hutchinson Channel runs through residential areas of Aurora, Colorado. This channel is used to carry storm water downstream in a high water event and keep nearby homes from flooding. Originally built in the 1970’s, the channel is now in need of repairs.
|
Hyundai Motor America Headquarters - MP GroutThe Hyundai Motor Corporation Corporate Headquarters has been located in California since 1985. As the fifth largest automotive company in the world, Hyundai oversees the business of around 800 dealerships nationwide. Due to business growth, the company has decided... |
I-25 and Santa Fe Interchange - PT GroutsThe Colorado Department of Transportation (CDOT) is making variety of improvements to the infrastructure and operations of the busy interchange at I-25 and Santa Fe Drive close to downtown Denver, CO.
|
Leprino Foods Cheese and Whey Plant - GP GroutUS SPEC was contacted to help after not finding a patch that matched the existing panels. After trying several different patching products by other manufacturers, patching crews found Transpatch to be their top choice. |
Lone Tree Water Tank - PT GroutsDenver Water has made it a priority to increase storage capacity at the Lone Tree facility. NA-50 grout was chosen to fill the annular space between the conduit and steel cables and was then tensioned. |
Nalley Valley - NA GroutNearly 131,000 vehicles travel each day through the Nalley Valley Interchange. Because the interchange was too narrow to accommodate additional traffic lanes, Atkinson reconstructed the roadway by building three new bridges with a total of 400,000 sq. ft. of bridge deck.
|
Payson Bridge Deck Replacement - MP GroutThis DOT project implemented Utah's Accelerated Bridge Construction program which is shaping bridge construction for the future.
|
Peoria Crossing - PT GroutsThis post-tension bridge needed a grout that met several physical requirements including having a fluid consistency, ease of long distance pumping, an extended working time and a specific strength. NA-50 was chosen because it met these requirements.
|
Perris Valley Aquatic Center - MP GroutThe new, Perris Valley Aquatic Center was built in Perris Valley, California due to the hot summer temperatures. In April 2011, the 18,000 square foot design received funding by the county’s Redevelopment Agency for Construction.
|
Pit 5 Powerhouse - MP GroutThe Pit 5 Powerhouse is a hydroelectric powerhouse located in the Pit River in California’s Central Valley. Operating since 1944, the powerhouse was in need of several repairs, with most of the repairs being done underwater.... |
Snoqualmie Pass Snow Shed - RA GroutIn March of 2013, the Federal Highway Administration (FHA) and Washington State Department of Transportation (WSDOT) approved the I-90 Snoqualmie Snow Shed Project.... |
SR 520 Bridge Replacement - NA GroutSR 520 will be the largrst floating bridge in the world and the largest post-tenstioning project US SPEC has had to date. |
Tualatin C-2 Reservoir - MP GroutThe C-2 Reservoir in Tualatin, OR (near Portland) needed to be grouted underneath the structure to help protect it during seismic activities. After a failed attempt using a competitor's product, CH2M Hill selected MP Grout to finish the job. |
Waterton Road Box Culverts - MP GroutWaterton Road, located in the southwest Denver metro area, was undergoing repairs and needed a unique soluction to fill a void located above walls poured to add additional strength to the existing box culverts... |
Willamette River Transit Bridge - PT GroutsThe Willamette River Transit Bridge is a 1,720 foot long bridge; reaching 180 feet tall, it will be the first bridge to span the Willamette River since 1973 in the Portland area. It will also be the first of its kind in the United States.... |
Williams Creek Pump Station - MP GroutMore than a Pipeline. A Lifeline. Southern Colorado’s future requires water. The Southern Delivery System (SDS) will maximize the current system in Pueblo and El Paso County, Colorado. The SDS is the largest project of this type in Colorado to date. |
Xactware Headquarters - GP GroutXactware Software Co. specializes in developing computer and mobile solutions for property insurance, remodeling and restoration. In 2012, ground was broken for a new 210,000 sq. ft $50 million headquarters in Lehi, UT.... |