Peoria Crossing

Denver, CO 2014
PRODUCT(S) USED: NA-50

This post-tension bridge needed a grout that met several physical requirements including having a fluid consistency, ease of long distance pumping, an extended working time and a specific strength. US SPEC NA-50 was chosen because it met these requirements.

View Project Profile

Peoria Crossing

NA-50

High Flow, Zero Bleed, Non-Aggregate, Non-Shrink Grout